# Battery Storage leads in the UK

Yes, AceLeads supplies commercial battery storage leads across the UK, from businesses, landlords, farms and estates teams scoping a battery energy storage system on their own site. Each lead names the site type, the current energy spend, the space available for a battery and where the site stands on its grid connection, so you can judge whether a scheme is viable before you pick up the phone. Most also flag whether commercial solar or EV charging is in scope, because that is how these projects are now specified. Leads are matched by project type, site type, spend and region, and you reserve the ones you want before paying anything.

## About these leads

Battery storage is rarely sold on its own. On UK commercial sites it is now specified alongside rooftop solar and EV charging as one scheme, shifting generation into the evening peak, trimming demand charges and protecting a connection that is already tight. That makes qualification unusually specific. What decides whether a site is worth surveying is the type of site and how it draws power through the day, the current energy spend, the space available for an indoor or containerised system, and the position with the distribution network operator, including any import or export limit already applied. Our battery storage leads have shared those points before they reach you, along with whether solar or EV charging sits in the same project, so an EPC or BESS specialist can sketch a scheme and a payback story on the first call instead of the third. The contact is a decision-maker, an owner, a director, or the facilities or estates manager who runs the site, because a project of this value needs someone who can commission a survey and take a capital decision forward.

## Who buys these leads

- Commercial solar EPCs
- Battery storage (BESS) specialists
- Energy consultancies & ESCOs
- M&E and electrical contractors

## What each lead includes

- Contact & business details
- Decision-maker role (owner, director, facilities or estates)
- Site type (industrial, warehouse, retail, farm, offices)
- Current energy spend
- Space available for the battery (plant room, yard, external compound)
- Grid connection position, including any known import or export limit
- Whether solar or EV charging is in scope
- Half-hourly metering in place (where given)
- Ownership or lease position on the site
- Stage and timeframe (scoping, budgeting, quoting)
- Region / postcode

## Filter these leads by

- Project type
- Site type
- Energy spend
- Grid position
- Region

## Frequently asked questions

### Are these commercial battery leads or domestic ones?

Commercial. These are businesses, landlords, farms and estates teams looking at a battery energy storage system on their own site, not householders adding a small battery to a domestic array. Domestic battery interest comes through our solar leads instead.

### Do the leads include solar and EV charging as well?

Often, yes. Battery storage on UK commercial sites is usually scoped as part of a wider scheme with rooftop solar and EV charging, so every lead flags what else is in play. If you only want battery-led enquiries, filter to those.

### How do I know a site can actually take a battery?

Each lead carries the signals that decide it: the site type and how it uses power, the space available for an indoor or containerised system, the current energy spend, and where the site stands with its distribution network operator, including any import or export limit already applied. That is enough to rule a site in or out before you commit to a survey.

### Who is the contact on a battery storage lead?

The decision-maker, usually the owner, a director, or the facilities or estates manager responsible for the site. A project of this size needs someone who can authorise a survey and carry a capital decision, so the role is captured in every lead.

### Are commercial battery storage leads exclusive?

They can be. Exclusive leads are routed to you alone, which suits projects of this size where two installers chasing the same site helps nobody. Shared leads go to a small number of buyers and cost less. Either way you reserve what matches your criteria for free and pay on results, on a percentage of the job value agreed in writing before you start.

---

Source: https://aceleads.co.uk/industries/battery-storage
Last reviewed: 2026-08-13
Contact: info@aceleads.co.uk
AceLeads is a UK-registered business.
